[Construction Case] Agricultural Water Conservancy Project - Installation of Water Conveyance Pipes
Rental of aluminum vertical ladders as a safety measure! Introduction of construction examples for water supply pipe and partition valve installation.
We would like to introduce a case study of the water conduit installation work ordered by the Agricultural Policy Bureau. The pipes being installed are ductile cast iron pipes with diameters ranging from φ300mm to φ600mm, and this section is constructed using "GPL soil retention." We used "36 panels" in areas where some shut-off valves are installed. Since the pipes are buried along the road, aluminum sheet piles are used to fill the gaps in the soil retention at the curves. Additionally, as a safety measure, we also rented "aluminum vertical ladders." 【Equipment Used】 ■ Aluminum Sheet Piles ■ 36 Panels ■ GPL Soil Retention ■ Aluminum Vertical Ladders *For more details, please refer to the PDF document or feel free to contact us.